Outside
Plant Network Project consisting of Primary, Secondary & Distribution Cable from MDF
to DP including survey, design, distribution, installation, testing & commissioning at
Bhiwari, Rohtak District, Haryana - 50 KM |
Hindustan
Cable Ltd. (HCL) |
| 2 |
Outside
Plant Network Project consisting of Primary, Secondary & Distribution Cable from MDF
to DP including survey, design, distribution, installation, testing & commissioning at
Charki - Dadri, Rohtak District, Haryana - 50 KM |
Hindustan
Cable Ltd. (HCL) |
| 3 |
After
Sales Services & Warranty for CDOT exchange in Bihar Grade (DOT) |
Punjab
Communications Ltd. |
| 4 |
Installation
of Paging System at Guwahati, Jorhat, Tihsukhia & Srinagar. The system included
complete Infrastructure including Tower, Antenna, Switch, Exchange etc. all other Software
& Hardware. |
NICE
Paging |
| 5 |
Containarised
Remote Line Unit including Power Plant & PCM of E-10B Exchange at
Lucknow 2000
Lines
Kanpur 2000
Lines
Ranchi 1000
Lines
Calcutta 3000
Lines
|
Department
of Telecommunication (DoT) |
| 6 |
E-10B
PCB Repair Center: Setting Up repair center at Bombay, Calcutta & Madras for repair of
Electronics Exchange PCBs. |
ITI
Ltd. |
| 7 |
Optical
Fibre Cable (Inter-City Trunk Route) :
Laying HDPE pipe
and pulling OFC Cable (Hapur - Khurja Sector) - 60 KM
OFC Installation
at Faridabad - 20 KM
Installation,
Testing & Commissioning of 2 MM PCM System at Faridabad - 28 Nos.
|
DoT
|
| 8 |
PCM
& QUAD Cables (for Junction Work) :
Laying,
Jointing, Termination & Testing at Faridabad - 90 K.m.
|
DoT
|
| 9 |
Primary,
Secondary & Distribution Cable Laying, Jointing, Termination, Testing &
Commissioning at
Faridabad - 4000
Lines
Indore - 3000
Lines
Delhi - Laxmi
Nagar
Gwalior - 250
KM. Cable
|
DoT
& MTNL |
| 10 |
2/15,
MARR System Installation with basic station at Jhandharpur (NO. DTN-W-202/MARR/91-92/Part
dated 22.02.92. |
Director
Telecom (N), DoT |
| 11 |
Installation
Testing Commissioning of Digital TEMA at SAIL (Bokaro and Rourkella). |
Gujrat
Electronics & Communications Ltd. |
| 12 |
Paging
system Installation at Patna. |
Glaynare
Electronics |
| 13 |
Installation
of 2/15, and 4/30 MARR system in different parts of State. |
Tamilnadu
Telecom Circle |
| 14 |
Installation
of 6 Chl. UHF System Between Dalsing Saria and Patori. (NO. DTN/C-DOT/Monitoring dated
24.03.92) |
DET,
DoT |
| 15 |
Installation
of 9 Nos. LDPTS on single Chl. VHF at Madhubani and Jamshedpur. (NO. BR-LDPT/TENDER
91-92/51 dated 26.03.92) |
CGM
Telecom DoT |
|
16
|
Installation
of 4/30 MARR System at Shebganj. (BR-LDPT/Tender dated 16.10.92) |
GGM
Telecom DoT |
| 17 |
Foundation
& Tower erection of one 30 M & two 50 M for installation of wireless system on
embarkment of Kosi River for flood forecasting. (136/Misc/Tower/92-93 dated 26.11.92) |
Bihar
State Construction Copper Ltd. (BSCCL) |
| 18 |
Primary
and Secondary Cable work at Bhopal (24 K.m.) |
Bharti
Telenet jointly with Astra |
| 19 |
Telephone
Duct/through Bhopal city (40 duct pipe K.m.) |
Bharti
Telenet jointly with Astra |
| 20 |
Bhopal
- Beoura OFC Cable (112 K.m.) |
Bharti
Telenet jointly with Astra |
| 21 |
Gwalior
town Duct route (16 pipe K.m.) |
Bharti
Telenet jointly with Astra |
|
22
|
Gwalior
Palampur OFC cable (24 K.m.) |
Bharti
Telenet jointly with Astra |
| 23 |
Gwalior
- RSU Route OFC cable (16 K.m.) |
Bharti
Telenet jointly with Astra |
| 24 |
Primary
& Secondary cable Sambha Telephone DoT (Jammu) (55 K.m.) |
DoT/TCIL
|
| 25 |
Primary
& Secondary cable Bemina Telephone (Srinagar) 60 K.m. |
DoT/TCIL
|
| 26 |
Primary
& Secondary cable Soura Telephone (Srinagar) 96 K.m. |
DoT/TCIL
|
| 27 |
Primary
& Secondary cable Zainakot Telephone (Srinagar) 45 K.m. |
DoT/TCIL
|
| 28 |
Primary
& Secondary cable Barazula Telephone (Srinagar) 110 K.m. |